Archived publication

Archived publication

Hitting Bull’s-eye with Time and Cost Estimates by Combining Statistics and Engineering, a Statoil Case Study

Hollund, Knut Utne; Hauge, Ragnar; Rosenlund, Helge; Akcora, Svein

September 21, 2010

SAND

  • Refereed: 0
  • Conference: SPE ATCE 2010, Florence, Italy
  • Title: Hitting Bull’s-eye with Time and Cost Estimates by Combining Statistics and Engineering, a Statoil Case Study
  • Author(s): Hollund, Knut Utne; Hauge, Ragnar; Rosenlund, Helge; Akcora, Svein
  • Published date: September 21, 2010
  • Page(s): 6
  • ISBN:
  • Publisher: Society of Petroleum Engineers