Archived publication
Archived publication
Hitting Bulls-eye with Time and Cost Estimates by Combining Statistics and Engineering, a Statoil Case Study
September 21, 2010
SAND
- Refereed: 0
- Conference: SPE ATCE 2010, Florence, Italy
- Title: Hitting Bulls-eye with Time and Cost Estimates by Combining Statistics and Engineering, a Statoil Case Study
- Author(s): Hollund, Knut Utne; Hauge, Ragnar; Rosenlund, Helge; Akcora, Svein
- Published date: September 21, 2010
- Page(s): 6
- ISBN:
- Publisher: Society of Petroleum Engineers